Uptown/City Park
The Uptown neighborhood was one of Denver's first streetcar suburbs in the late 1800's. The neighborhood was once filled with mansions built by some of Denver's wealthiest business owners. However, during the 1960's and 1970's, many of the blocks on the western side of the neighborhood, closest to downtown, were razed to make room for surface parking lots. Thankfully, the Victorian era homes in the eastern portion of the neighborhood survived. The neighborhood is currently undergoing a buildings boom, with the surface lots now being replaced by condominium and loft buildings of all sizes. The current population of the neighborhood is approximately 8,200. Over 400 new units are under construction or proposed in the area. The neighborhoods around Denver's City Park are filled with renovated historic homes, with very little new construction underway. However, a few projects are in the works, including a massive 800 unit development on the old Mercy Hospital site. The current population is approximately 6,000. (Click on the thumbnails for larger pics)
|
Portofino Tower
Location: 1800 Grant St. Height: 177 feet Floors: 14 Completion Date: 2004 Project Details: This 54 unit luxury condominium tower is being constructed on the eastern edge of downtown. |
|
Tower on the Park
Location: 1950 Logan St. Height: 168 feet Floors: 13 Completion Date: 2004 Project Details: This 143 unit condominium tower will include 2 story townhome units at the base to blend with the existing buildings in the neighborhood. |
|
City Park South
Location: 1600 Fillmore St. Height: Up to 310 feet Floors: Up to 28 Completion Date: 2006 Project Details: This project will include up to 850 new residential units in a mix of low, mid, and high rise condominium buildings. 22 and 28 story towers are planned as part of the project, located on the site of the old Mercy Hospital. |
|
Park Avenue HOPE VI Project
Location: Park Ave. & 20th Ave. Height: Up to 150 feet Floors: From 3 to 12 Completion Date: 2006 Project Details: This project will include as many as 847 apartments and condo units. The project will be developed as a mixed-income project - with subsidized and market-rate units. Retail will be provided on the ground floor along 20th Avenue. The project will include townhomes, 4 and 5 story apartment buildings and a 12 story condo tower. |
|
Swallow Hill Condominiums
Location: 1600 Clarkson St. Height: 95 feet Floors: 4/7 Completion Date: 2003 Project Details: This project will include 116 condominium units on almost a full block in the Uptown neighborhood. |
|
St. Lukes Lofts
Location: 1700 Washington St. Height: 95 feet Floors: 7 Completion Date: 2002 Project Details: This 41 unit luxury condominium project is being developed as part of the Uptown Square development on the site of the old St. Luke's hospital. |
|
Denver Square
Location: 1700 Downing St. Height: 85 feet Floors: 6 Completion Date: 2003 Project Details: This 48 unit condominium project is planned on the eastern edge of the Uptown neighborhood.
|
|
450 17th Avenue
Location: 1700 Pennsylvania St. Height: 75 feet Floors: 5 Completion Date: 2005 Project Details: This 45,000 square foot mixed-use building will include ground floor retail, three floors of office space, and two residential units on the top floor. A second phase will consist of a 7 story apartment building.
|
|
Chamberlin Heights
Location: 1500 Steele St. Height: 60 feet Floors: 4 Completion Date: 2003 Project Details: This 42 unit condominium building is located on the southern edge of the City Park neighborhood, and will include ground floor retail space facing Colfax Avenue. |
|
The Griffin
Location: 2200 Washington St. Height: 60 feet Floors: 4 Completion Date: 2003 Project Details: This 52 unit condominium building is located on the eastern edge of the Uptown neighborhood. |
|